Civil And Structural Engineer
Approve the job safety analysis and the method of statement related to the civil and structural activities. In charge of supervising all civil and building erection works in accordance with site Inspection & test plan. In charge of replies to Field Changes and Technical Queries. Ensures the compliance of the works performed with the project drawings. Ensures the compliance of the works performed with the Client quality standards & specifications. Knows and uses project drawings and Client specifications in order to perform the Scope of Work. Shall anticipate the works coming (based on the approved S/C schedule and with the construction manager) studying the project drawings in advance, clarifying with the project engineer the potential questions, verifying that the S/C will be ready to perform its works (critical material available, specialized companies or resources mobilized, Methods of statements issued & approved…). Shall ensure that Client free issue items required for its own Scope of Work are delivered in time & make coordination with the Material manager. Shall ensure that AS BUILT drawings are properly issued and updated by the S/C on a weekly basis. Shall be a safety actor by reporting safety hazardous situation or non-conformities. Shall stop the works when safety or quality issues are found until corrective action is implemented. Performs all the inspections on site as per ITP (with the support of site QA/QC team when required). Updates the own set of project documents (drawings…) with the last revisions issued. Is the leader of the S/C weekly meeting and issues the Minutes of Meeting. Follows up the detail schedule with S/C, reports any deviation on a weekly basis to the site manager and establishes action plan with S/C to recover the delay. Opens NCR related to the Scope of Work, proposes solutions and follows them until they are closed informing the QA/QC manager. Performs weekly reviews on the compilation of the quality files (by the S/C) & informs QA/QC manager in case of major deviation found. Reviews, comments & supports the QA/QC manager in order to approve the ITP. Updates & signs the ITP with the inspection performed. Validates on a weekly basis the progress on the Scope of Work through feedback to the site manager. Supports the site manager in order to track the installed quantity on all the Scope of Work. Track the quantities in order to ensure the remeasurement of the scope of work. Shall lead tool box with the subcontractor 2 to 3 times a week on specific safety or technical points with the support of HSE manager for safety tool box and technical tool box with the site manager. Issue to the site manager & project engineer a daily report of activities, problems encountered and actions to be taken.
#J-18808-Ljbffr
Diventa il primo a rispondere a un'offerta di lavoro!
-
Perché cercare un lavoro con PostiVacanti.it?
Ogni giorno nuove offerte di lavoro È possibile scegliere tra un'ampia gamma di lavori: il nostro obiettivo è quello di offrire la più ampia selezione possibile Ricevi nuove offerte via e-mail Essere i primi a rispondere alle nuove offerte di lavoro Tutte le offerte di lavoro in un unico posto (da datori di lavoro, agenzie e altri portali) Tutti i servizi per le persone in cerca di lavoro sono gratuiti Vi aiuteremo a trovare un nuovo lavoro